Lighting Design Offices and Workshops
Rellingen, Germany
1999
BRT Architekten
 
click image to view each page of precedent images in sequence...



 

- Structure of laminated structural timber portal frames 
   (spaced at 5 m intervals)
- Clad in aluminium panels (sandwich panels which form the external skin)
- Concrete slab on stip foundations
- The elimination of the basement reduced construction time and cost; 
   although, the Canadian climate usually requires deep foudations due to
   frost depths
- Adjustable glass louvres emphasize the horizontal flanks of the tube and
   reduce glare, permitting work on computer screens
- On the south side, 54 sqm of a prototype structural glazing with integrated
   solar collecting panels forms part of the elevation and the energy 
   produced serves all of the building's electrical needs, including a 24-
   hour lamp testing laboratory in the design studio
- Note, the building's form makes it unsuitable for a dense urban setting