project XX - post ter avest architecten
office space[delft, netherlands 1999]
materials selection
design for disassembly in 20 years-standard lifespan for office
zero product leftover at deconstruction, zero trace, in theory
achieved by decay, recycle, reuse
flexibility in design
open floor plan for maximum adjustments in use



File written by Adobe Photoshop® 4.0File written by Adobe Photoshop® 4.0
laminated wooden columns + beams
connections using steel hooks + bolts
floor construction - cassettes filled w/ sand + covered
        w/ cement bonded slabs
wood frame façade w/ triple glazing
modularity + dimensioned w/ standard material sizes